Welcome to the official website of Wuxi Wanli adhesion materials Co., Ltd

Pioneer of PUR bonding technology in China

The first enterprise in China to collect R & D and production
of environmental protection products such as hot melt adhesive

Service hotline Wanli

0510-85345357
#

project case

Engineering case

Filling, foaming and pressure maintaining

2020-07-15 361

Filling, foaming and pressure maintaining


1. Lower glue cost and lower unit workpiece cost (including equipment depreciation).

 

2. Labor saving (2 ~ 3 people are needed for the whole line, 1 person is required to place the product, 1 person is required to inspect the process and change the glue, and 1 person is required to take the product / appearance inspection).

 

3. Better performance (drawing force, high and low temperature resistance, corrosion resistance and aging resistance).

 

4. High production efficiency (glue coating is completed in 10 seconds).

 

5. The process equipment has good stability and higher yield.

 

6. The pipeline length of the whole system is ~ 23m.





73.png

Advantages of gluing scheme

 

1. Lower glue cost and lower unit workpiece cost (including equipment depreciation).

 

2. Labor saving (2 ~ 3 people are needed for the whole line, 1 person is required to place the product, 1 person is required to inspect the process and change the glue, and 1 person is required to take the product / appearance inspection).

 

3. Better performance (drawing force, high and low temperature resistance, corrosion resistance and aging resistance).

 

4. High production efficiency (glue coating is completed in 10 seconds).

 

5. The process equipment has good stability and higher yield.

 

6. The pipeline length of the whole system is ~ 23m.